What Buyers and Design Teams Need to Know Before Mass Production Starts
Table of Contents
Yes, you can change some details after sample approval — but only if production hasn’t started or if the changes are cosmetic (like logo position or packaging). Structural and material changes are usually locked once production prep begins.
🎯 Introduction: What Happens After the Sample Is Approved?
You’ve finalized the sample, everyone’s signed off… but now someone on the brand team wants a tweak.
Changing things at the wrong time could mean delays, cost increases, or even redoing production.
At Samtop, we understand timelines and stakeholder realities — so here’s exactly what you can and can’t change after sample approval (and how to do it wisely).
✅ Change Types: What Can (and Can’t) Be Changed After Sample Approval?
Change Type | Flexibility | Notes |
---|---|---|
Cosmetic (Color / Logo) | 🟡 Maybe | Possible if production hasn’t started |
Structural (Shape / Size) | 🔴 No | Needs new mold, sample |
Material | 🔴 No | Raw materials are ordered after approval |
Packaging / Instructions | 🟢 Yes | As long as outer box not printed |
Labeling / Carton Quantity | 🟢 Yes | Can adjust during packing |
Electronics (LED, switch) | 🔴 No | Needs re-engineering, QC process |
🕒 Change Flexibility Based on Timeline
Stage | Flexibility |
---|---|
Before PO & Sample Approval | ✅ Full flexibility |
Within 2–3 days of approval | 🟡 Minor cosmetic changes |
Mid-production | 🔴 Limited / cost impact |
Post-production, pre-shipment | 🟢 Label or packaging edits |
After shipment | ❌ Too late |
💰 Cost & Timeline Impact Examples
Change | Cause | Impact |
---|---|---|
Change color | Switch black acrylic to white | Material loss + time |
Adjust logo position | Plate already made | New screen fee (~$50–$100) |
Add LED | New layout, rewiring | Delay + cost + redesign |
Outer box redesign | Before print stage | Low risk |
Add barcode / label | Any time before packing | Easy |
✅ Low-Risk Changes That Are Usually OK
- Carton barcode or project labeling
- Retailer SKU sticker
- Foam color (cosmetic only)
- Quantity per carton
- Instruction sheet design
- Master carton markings
✅ These do not affect structure, so they’re safe and fast to update.
🛠 Can We Resample If Changes Are Critical?
Yes — but:
- New sample = new cost + 7–10 extra days
- Puts production on hold
- May cause delivery delays
🎯 Tip: Only resample if you must change structure or electronics.
✅ Samtop’s Final Advice: Align Creatively and Technically
📌 Many teams approve a sample technically but forget brand/marketing still needs a look.
Checklist Before Final Sample Approval:
- VM team alignment
- Brand marketing sign-off
- Regional team feedback
- Packaging/legal mark confirmation
✅ Confirming everyone’s voice helps avoid last-minute production risks.
🎯 Conclusion: Flexibility Is Possible — When Communicated Early
Small cosmetic tweaks may still be doable. Big structural changes? Plan early.
At Samtop, we help you:
✔️ Know what changes are possible
✔️ Understand time/cost impact
✔️ Keep your campaign timeline safe
💬 Need to Make an Adjustment After Sample Approval?
Let’s talk. We’ll evaluate and advise based on current stage.