Tooling-Grade Manufacturing

High-Consistency, High-Volume Injection-Molded VM Parts

From giant 3D letters and seasonal icons to light-transmitting diffusers and modular connectors, Samtop engineers tooling-grade injection-molded components with integrated LED bays, magnets, and snap-fits for fast installs and nationwide consistency.

ABS • HIPS • PMMA • PC LED Integration Modular Systems Global Rollouts
Backlit VM Display
LED Integration

Why Injection Molding for VM?

Perfect when you need brand consistency across many stores with quick seasonal changeovers.

Form Freedom

Complex curves & crisp 3D geometry impossible with other methods

Finish Variety

Gloss, matte, texture, metallic, translucent, fluorescent options

Scale Economics

Once tooled, unit cost drops sharply for volume production

Integrated Structure

Light bays, magnet slots, rail grooves molded-in for efficiency

Core Product Types

Engineered for visual merchandising excellence

3D Letters

3D Letters & Logos

Dimensional brand elements with integrated lighting and mounting systems

Seasonal Icons

Seasonal Icons

Quick-change themed elements for holiday and promotional displays

Light Diffusers

Light Diffusers

Translucent panels and components for even illumination distribution

Integrated Scene Kits

Treat molded parts like building blocks: recombine to deliver multiple scenes

Window Theme Kit

Molded 3D logo + seasonal shapes + backlit PC/PMMA diffusers for stunning window displays

3D Logo Seasonal Backlit

In-Store Guidance

Molded directional arrows, area letters, sign clips on rails for seamless navigation

Wayfinding Modular Rail Mount

Tradeshow Fast-Build

Modular frame connectors + clip-on shades + 3D logo for rapid booth assembly

Fast Setup Modular Reusable

From Creative to Production

Seamless workflow from concept to mass production

A. Concept → Tooling Handoff

1

Creative & Concept

Sketches, theme colors, sizes, mount options (stand/hang/magnet/backlit)

2

3D Modeling & Prototype

SolidWorks/UG/NX modeling; 3D-printed samples for verification

3

Tooling Design

Steel selection (P20/718H/H13), split lines, multi-cavity planning

4

T1/T2/T3 Trials

Check dimensional accuracy, surface quality, color consistency

B. Mass-Production Cycle

1

Material Preparation

Resin drying, colorant mixing, quality pre-checks

2

Injection Molding

Automated production with real-time monitoring

3

Finishing & Assembly

Surface treatments, LED integration, final assembly

4

Quality Control

100% inspection, testing, packaging for shipment

Material Selection Guide

Choose the right material for your application

ABS

ABS Plastic

Excellent impact resistance and surface finish quality

Durability
Cost
PC

Polycarbonate

Crystal clear transparency with exceptional strength

Clarity
Impact
PMMA

Acrylic (PMMA)

Optical clarity with excellent light transmission

Light Trans.
Weather Resist.

Showcase Gallery

Real projects, real results

⭐ Featured Project

Window Kit: 3D Logo + Seasonal Icons + Backlit Panel

Injection-molded ABS logo, PS seasonal shapes, PC diffuser with molded-in magnet bays & rear cable routes for plug-and-play install. Two-hour rollout; reusable for future themes.

ABS Logo PS Seasonal PC Diffuser LED Ready
Window Display Kit
Wayfinding Set

Wayfinding Set 🧭

PP arrows + ABS letters with rail mounts

Tradeshow Build

Tradeshow Fast-Build 🏗️

ABS connectors + PMMA shades + molded logo

Holiday Icons

Holiday Icon Pack 🎄

Multi-cavity tools for fast colorway refresh

Frequently Asked Questions

Everything you need to know about injection molding for VM

Why injection molding for VM?

For large quantities with identical quality, rich finishes, and integrated features that speed installation. Perfect for multi-store rollouts requiring brand consistency.

What materials do you use?

ABS, PP, PS, PC, PMMA, and modified resins including UV-resistant, flame-retardant, glass-filled, and fluorescent variants.

Can features like magnets and light bays be molded in?

Yes — we engineer magnet pockets, snaps, keyholes, wire channels directly in the tool for seamless integration and faster installation.

How do you keep colors consistent across stores?

Masterbatch in resin, strict ΔE targets, gloss control protocols, and retained color standards ensure perfect brand consistency nationwide.

What are typical timelines?

Tooling & T1/T2/T3 trials: 3–6 weeks (scope-dependent); mass production scheduling begins immediately after approval.

Request Your Injection-Molded VM Parts Consultation

High consistency & scale with molded-in features, IML/two-shot/halo-lit premium finishes, and rollout-ready kits for fast seasonal changeovers.

✓ Tooling-Grade Quality ✓ Global Rollout Ready ✓ LED Integration ✓ Fast Seasonal Updates