What Global Brands Need to Ask Before Placing an Order
By Yan Luo | Samtop Display
Table of Contents
โ Choosing a retail fixture supplier in Asia is not just about price โ it’s about capability, transparency, and trust. Whether you’re launching a 500-store POP campaign or a boutique VM unit, your supplier must deliver not only whatโs quoted, but what works in-store.

At Samtop, we help brands match fixture complexity with factory strength. Hereโs how to audit and choose your vendor โ before you commit.
โ Summary: How to Evaluate a Fixture Supplier in Asia
A solid fixture vendor should offer:
- In-house control of materials (metal, MDF, acrylic)
- Engineering drawings with BOM-level clarity
- Visual QC reports and sample turnaround under 14 days
- Export knowledge (UL, CE, FSC, packaging, documentation)
- Fluency in retail โ not just OEM furniture or cabinetry
If they canโt show this upfront, proceed cautiously.
๐งฑ 1. Match Their Core Strength to Your Fixture Type
Fixture Type | Needed Capability |
---|---|
Premium floor plinth with LED | Acrylic bonding + wiring integration |
MDF modular display (KD) | CNC cut + matte PU or powder finish |
Logo-heavy VM for cosmetics | Precision engraving + branding application |
Multi-store kits for rollout | Batch QA, tool bags, visual instructions |
Travel retail lightboxes | LED-certified components + secure cabling |
๐ Related: What to Include in a Retail Display BOM
๐ง 2. Ask These Questions in the First Supplier Call
- โWhat % of your work is in retail display?โ (Not kitchen cabinets or OEM)
- โDo you provide full 3D + finish drawings before quote?โ
- โIs acrylic/metal/MDF produced in-house or outsourced?โ
- โWhatโs your sampling lead time and mass production window?โ
- โCan you share previous QA photos or inspection logs?โ
- โHave you exported to EU, US, GCC before? Any references?โ
โ ๏ธ Red flag: Vague answers, or only a catalog with zero mention of past projects.
๐ Tip: Use a sample brief to test their communication and design interpretation early.
๐ผ๏ธ 3. What to Request Before Sending a Purchase Order
Before you invest time or tooling costs, ask for:
- Factory photos (spray booth, packaging station, logo application)
- Assembly area shots (to confirm KD fixture experience)
- Sample images of previous POP or VM projects
- A packing checklist or store toolkit sample
- Finish samples: PU, powder coat, logo options (metal, UV, silk-screen)
๐ Check our Visual QC Setup Guide to see what good factory reporting looks like.
๐ 4. Core Metrics You Should Evaluate
Metric | Benchmark |
---|---|
Sample turnaround time | 7โ14 working days |
Surface rejection rate | <5% post-QA inspection |
Assembly tolerance | โค1mm gap (after dry fit) |
CBM optimization skill | Can provide full 40HQ load plan |
BOM/packing documentation | Export-ready, version controlled |
๐ Ask to see previous BOM sheets or photo-based QA logs.
๐ 5. Run a โTest Briefโ Project Before Scaling
Send a test RFQ with 1 SKU only. Include:
- Key dimensions + finish spec
- Material preference + logo method options
- Power spec if applicable (110V, 230V, USB, etc.)
- Request 3 logo mockups (UV, laser plate, sticker)
- Timeline to sample + finish approval
The goal? Not just to see the product โ but test their thinking.
๐ Related: How to Write a Fixture Brief That Gets Quoted Right
๐ 6. China vs Vietnam: Supplier Evaluation Notes
Category | China โ | Vietnam โ๏ธ |
---|---|---|
Sampling speed | 7โ10 days | 10โ20 days |
Multi-material builds | MDF+acrylic+metal | Usually 1โ2 materials |
Labor cost | Mid | Lower (esp. Bรฌnh Dฦฐฦกng) |
Certification support | UL, CE, FSC in-house | May require 3rd-party |
Communication | Fluent, file-literate | Often requires interpreter |
๐ Related: China vs Vietnam: Where to Produce Your Display Fixtures
๐ฌ FAQ
Q: Can I get accurate pricing without a full 3D file?
โ
Yes โ if you provide exploded diagrams + finish specs + visual references. We offer brief templates here.
Q: Do Vietnam suppliers have in-house UV/PU coating lines?
โ ๏ธ Rarely. Most do basic powder or matte laminate. Use China for high-spec finishes.
Q: Should I trust a factory that wonโt share photos or references?
๐ซ No. Transparency is a sign of process maturity. Ask for blurred client photos if under NDA.
โ Conclusion: Vetting Saves More Than Just Cost
โ๏ธ Don’t settle for vague capability claims โ request BOMs, QC logs, sample timelines
โ๏ธ Test with one SKU before committing to a full range
โ๏ธ Match your fixtureโs finish, function, and rollout scale to the factoryโs proven experience
โ๏ธ Use visual checklists and teardown-ready specs to evaluate readiness
โ๏ธ Always confirm communication flow, packaging ability, and rollout history
At Samtop Display, we help brands source smart โ reducing sampling time, ensuring visual consistency, and building reliable supplier partnerships across Asia.
๐ฉ Need Help Vetting a Supplier or Running an Asia-Based Rollout?
We provide:
โ
Factory matching by product type (MDF, acrylic, LED)
โ
Sample briefing tools + QC checklist templates
โ
Visual QA guides + rollout crate documentation
โ
English / ไธญๆ / Tiแบฟng Viแปt coordination from quote to crate
๐ง [email protected]
๐ www.samtop.com